低水头电站尾水段河床清理设计  被引量:1

The Design of River Bed Cleaning in Tailrace Section of a Hydropower Plant with a Low Water Head

在线阅读下载全文

作  者:徐红祥 吴泽华 

机构地区:[1]云南省昆明市石林县水务局,云南石林652200 [2]福建省水利水电科学研究院,福建福州350001

出  处:《云南水力发电》2010年第4期12-14,44,共4页Yunnan Water Power

摘  要:福建省闽江上游支流的河床式水电站有水头低、流量大、河道地形多变的特点,灯泡贯流式发电机组出力对上、下游水头差极为敏感。通过对金溏水电站尾水出口段河床滩地清理水力计算,在获得满足不影响电站机组出力要求的尾水段开挖高程和型式布置,使滩地开挖量较小。The river bed type hydropower plants located on the upstream tributaries of the Minjiang River are characterized by low head, large discharge and variable topography of river channels, and the output of a bulb through flow type turbo- generator unit is extremely sensitive to upstream and downstream head difference in Fujian Province. The hydraulic calculation for cleaning of alluvial plain in the tailrace outlet section of Jintang Hydropower Project was made to reduce excavation quantity of the alluvium plain on condition that both excavation elevation and configuration of the tailrace section meet the output requirement of the generating units of the hydropower plant.

关 键 词:低水头电站 尾水段 河床清理 电站机组出力 金溏水电站 

分 类 号:TV135.3[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象