摘 要:工程变更估价三原则在合同工程子项价格基本合理的情况下可以公平的高效率的适用,但在合同中可适用参照的工程子项价格明显偏高或偏低的情况下适用该三原则就明显不公平,应该进行补充和完善。文章从工程合同中的不修改合同原则及合同法中的实质公平原则出发,提出了在合同工程子项价格非正常情况下工程变更估价的方法,并据此提出完善工程变更估价三原则的建议。The three principles of valuation of engineering variation equitably and efficiently apply when the prices of project sub-items are reasonable in initial contracts.However,when the prices of the project sub-items are significantly high or low,it manifests inequitable to apply those three principles.Therefore,it needs to supplement and improve those three principles.This paper analyzed the principle of un-modifying contract in construction contracts and the principle of substantial equitable in contract law,and proposed suggested a evaluation method for engineering variation when the project sub-items in initial contracts are abnormal.Some suggestions were put forward to improve the principles of valuation of engineering variation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.248.40