300MW机组烟风系统设备单列设置探讨  被引量:13

Discussion on Single Set of 300 MW Unit Flue-Gas System

在线阅读下载全文

作  者:白杰[1] 彭红文[1] 朱大宏[1] 

机构地区:[1]华北电力设计院工程有限公司,北京市100120

出  处:《电力建设》2010年第9期87-90,共4页Electric Power Construction

摘  要:根据国内燃煤发电厂300MW及以上机组的锅炉烟风系统主要设备可用率及实际运行情况,从使用业绩、系统配置与运行经济性等方面分析了锅炉烟风系统主要设备采用单列配置的可行性;对单列配置及双列配置在节能减排、工程造价、可靠性等方面进行了综合的技术经济比较;对锅炉烟风系统主要设备采用单列配置提出了建议。Based on the availability ratio and performances of the major equipment of the boiler's flue gas system of 300 MW or above units in China,an analysis is made on the feasibility of the single set major equipment of the boiler's flue gas system in terms of past cases,system configuration and economical efficiency.And a comparison is made between the single and double set adaptation in terms of energy conservation emission reduction,project cost and reliability.Some suggestions are proposed on single set adaptation for the main equipment of boiler's flue gas system.

关 键 词:燃煤发电厂 烟风系统 单列配置 双列配置 节能减排 工程造价 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象