巴山水电站溢洪道挑流消能方案试验优化研究  被引量:6

Optimum Test on Bucket Dissipation of Bashan Hydropower Station's Overflow Spillway

在线阅读下载全文

作  者:李泽[1] 白呈富 张微 

机构地区:[1]昆明理工大学建筑工程学院工程力学系,云南昆明650051 [2]长江勘测规划设计研究院,湖北武汉430010

出  处:《云南农业大学学报(自然科学版)》2010年第5期706-711,共6页Journal of Yunnan Agricultural University:Natural Science

基  金:云南省应用基础研究计划项目(2008ZC028M);昆明理工大学校人才培养基金(校2008-061)

摘  要:针对巴山水电站溢洪道具有泄量大、水头高、下游消能区地质条件差等特点,通过1∶70整体模型试验对溢洪道的挑流消能防冲布置及消能形式进行了4个方案的试验研究。结果表明:优化方案四的挑流鼻坎形式较合理地解决了下游消能困难的缺点,基本能够满足工程实际的需要。Aiming at the characteristics of the Bashan hydropower station's spillway such as large flood discharges,high head,bad engineering geology of downstream energy dissipation area,the experimental research of four projects was proceeded by 1∶70 integral model test to the ski-jump energy dissipation,scour protection arrangement and energy dissipation type of the spillway.According to the results,the flip bucket type of the fourth optimal project was more reasonable to solve the problem of the difficult downstream energy dissipation,which could satisfy the demand of the practical engineering.

关 键 词:溢洪道 挑流消能 模型试验 巴山水电站 

分 类 号:TV651.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象