检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065
出 处:《西北水电》2010年第4期1-4,共4页Northwest Hydropower
摘 要:某电站施工围堰为土石围堰,当施工期上游来流超过围堰设计防洪标准相应的流量时,围堰就有可能发生溃决,一旦发生溃决,将对下游铁路桥、公路桥、集镇等重要设施及沿江两岸居民点产生影响,直接关系该电站施工期遭遇超标准洪水时下游防洪度汛工作,为此进行溃堰洪水分析计算,预测溃堰后洪水对下游的影响,以便提早采取相应的措施。The earth-rock cofferdam of a hydropower project may collapse when the upstream flow exceeds the corresponding flow specified in flood control design standard.If it occurs,it will danger the important facilities including railroad bridge,highway bridge,towns residential areas along both banks,which directly affects the flood control at downstream.Therefore it is necessary to carry out the flood analysis calculation and predict the effects of cofferdam failure on the downstream,in order to take corresponding measures in advance.
分 类 号:TV124[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117