机构地区:[1]中铁隧道集团有限公司科研所,河南洛阳471009
出 处:《隧道建设》2010年第4期385-387,410,共4页Tunnel Construction
摘 要:广州生物岛—大学城沉管隧道拉合试验包含短管节拉移、GINA止水带压缩及短管节顶推3个阶段,通过拉合试验测试出短管节底部摩擦力的大小及GINA止水带实际压缩情况,为拉合施工提供详实的参考数据。试验结果表明:短管节移动过程中的实际摩擦力远大于按常规摩擦系数计算出的摩擦力,短管节底部摩擦力的存在会造成GINA止水带实际压缩量不均匀。The experiment on the pulling-connecting of short elements of immersed tunnels consists of 3 stages,i.e.,short element pulling stage,GINA compression stage and short element pushing stage.The magnitude of the friction forces at the bottom of the short elements and the actual compression of GINA are measured in the pulling-connecting experiment.The experiment results indicate that the actual friction forces during the moving of the short elements are much larger than the values calculated on basis of the conventional friction coefficients and that the friction forces at the bottom of the short elements may result in uneven compression of GINA.
关 键 词:沉管隧道 短管节 拉合试验 管节拉移 GINA止水带压缩 管节顶推
分 类 号:U459.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30