检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]重庆交通大学土木建筑学院,重庆400074 [2]信息产业电子第十一设计研究院有限公司深圳分院,广东深圳518100
出 处:《交通科技与经济》2010年第5期77-80,共4页Technology & Economy in Areas of Communications
摘 要:以在建的新龙门大桥为工程背景,开展拱肋吊装过程扣索索力和预抬量的优化分析。采用有限元计算与优化分析相结合的方法对扣索索力和预抬值进行求解,索力和预抬值的计算以拱肋各标高控制点的高程偏差平方和最小为优化目标,以拱肋各个控制点的标高偏差为状态变量,采用一阶分析法对设计变量进行迭代优化。计算结果表明该方法具有计算精度高的优点,与实测结果吻合良好。With New Longmen Bridge for engineering background,the optimization analysis of cable forces and segmental cambers have been performed during arch rib segmental installment process.The method of FEM analysis combined with optimization was calculate the cable forces and segmental cambers.The calculate aimed at the square sum of the altitude deviation of all attitude-controlled nodes;it was limited by the allowable odds of the attitude-controlled nodes.The first order optimization method was introduced to acquire the cable forces and segmental cambers.The analytical result shows that this method has a high accuracy and tallies with practice.
分 类 号:U445.464[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.179.20