垃圾渗滤液与城市污水同步脱氮除碳正交试验  被引量:3

SIMULTANEOUS NITROGEN AND CARBON REMOVAL OF LANDFILL LEACHATE AND URBAN WASTEWATER BY ORTHOGONAL EXPERIMENT

在线阅读下载全文

作  者:石明岩[1] 冯兆继[1] 余建恒 王少林 夏耿东 

机构地区:[1]广州大学土木工程学院,广东广州510006 [2]广州市大坦沙污水处理厂,广东广州510163

出  处:《水处理技术》2010年第9期69-72,共4页Technology of Water Treatment

基  金:广州市科技计划项目(2007J1-Q411);广州大学新苗计划项目(20071002)

摘  要:采用倒置A2/O法同步对垃圾渗滤液与城市污水脱氮除碳。正交试验表明,水力停留时间是影响混合污水脱氮和有机物去除的控制因素;理论最优运行参数为HRT=9 h、ρ(DO)=2 mg.L-1、R=80%r、=200%,该工况下COD、NH3-N和TN的平均去除率分别为77.4%、97.2%和62.4%,出水浓度均可稳定达到城镇污水处理厂污染物排放标准(GB 18918-2002)一级A标准。Using the technology of nitrogen and carbon removal in the consolidated treatment of landfill leachate and municipal wastewater by reversed A2/O process.The results showed that HRT was the key factor for nitrogen and organic removal efficiency by orthogonal experiment.In conditions of HRT is 9 h,DO 2.0 mg·L-1,R 80%,r 200%,the effect of organic and nitrogen removal achieve the optimal synchronization and the average removal rate of COD,NH3-N,TN are 77.4%,97.2%and 62.4%,meanwhile the effluent concentration could steadily reached the discharge standard of pollutants for municipal wastewater treatment plant A-level standard.

关 键 词:倒置A2/O法 垃圾渗滤液 脱氮 除碳 正交试验 水力停留时间 

分 类 号:X703.1[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象