检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广州大学土木工程学院,广东广州510006 [2]广州市大坦沙污水处理厂,广东广州510163
出 处:《水处理技术》2010年第9期69-72,共4页Technology of Water Treatment
基 金:广州市科技计划项目(2007J1-Q411);广州大学新苗计划项目(20071002)
摘 要:采用倒置A2/O法同步对垃圾渗滤液与城市污水脱氮除碳。正交试验表明,水力停留时间是影响混合污水脱氮和有机物去除的控制因素;理论最优运行参数为HRT=9 h、ρ(DO)=2 mg.L-1、R=80%r、=200%,该工况下COD、NH3-N和TN的平均去除率分别为77.4%、97.2%和62.4%,出水浓度均可稳定达到城镇污水处理厂污染物排放标准(GB 18918-2002)一级A标准。Using the technology of nitrogen and carbon removal in the consolidated treatment of landfill leachate and municipal wastewater by reversed A2/O process.The results showed that HRT was the key factor for nitrogen and organic removal efficiency by orthogonal experiment.In conditions of HRT is 9 h,DO 2.0 mg·L-1,R 80%,r 200%,the effect of organic and nitrogen removal achieve the optimal synchronization and the average removal rate of COD,NH3-N,TN are 77.4%,97.2%and 62.4%,meanwhile the effluent concentration could steadily reached the discharge standard of pollutants for municipal wastewater treatment plant A-level standard.
关 键 词:倒置A2/O法 垃圾渗滤液 脱氮 除碳 正交试验 水力停留时间
分 类 号:X703.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15