检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:尹忠国
机构地区:[1]贵州电力建设第一工程公司,贵州贵阳550002
出 处:《贵州电力技术》2010年第8期78-80,共3页Guizhou Electric Power Technology
摘 要:以火电厂锅炉汽包水位测量系统为研究对象,根据多年从事火电厂的热工仪表安装及调试工作的经验,在对省内多家火电厂(纳雍电厂、发耳电厂、盘南电厂等)的汽包水住测量、水位保护的安装、调试过程中碰到的问题进行了分析和研究,总结了存在的问题,并分析了产生的原因,探讨并在安装方面消除或减少这些问题的技术改进措施。Taking water level measurement system of boiler steam drum in power plant as research objective, based on years of thermotechnieal instrument installation and test experience in power plant,this paper analyzes and studies the exciting problems in water level measurement, installation of water level protection and debugging in several power plants (Nayong Electric Power Plant, Faer Electric Power Plant, Pannan Electric Power Plant) ,and summarizes up the problems and analyzes their causes. The improvement measures to reduce or eliminate these problems in installation were discussed.
分 类 号:TK22[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222