检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]辽宁省水利水电勘测设计研究院,沈阳110006
出 处:《南水北调与水利科技》2010年第A01期58-59,共2页South-to-North Water Transfers and Water Science & Technology
摘 要:以观音阁水库输水工程为背景,从施工设备选型、辅助生产系统设计、资源综合利用等方面对大型输水工程施工期节能减排的具体实施措施进行探讨,提出水利工程节能减排设计中应注意的主要问题,为做好项目建议书及可研阶段报告的节能设计提供参考依据。Taking Guanyinge reservoir water conveyance engineering as an example, measures about energy-saving and emission reduction in large water conveyance engineering were reasearehed, including construction equipments selection, design on auxiliary production, resources comprehensive utilization and so on. The most important aspects about energy-saving design in the hydraulic engineering were emphasized. It can provide reference for energy-saving design in project proposal book and project feasibility report.
分 类 号:TV68[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185