检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]同济大学桥梁工程系
出 处:《同济大学学报(自然科学版)》1999年第2期239-242,248,共5页Journal of Tongji University:Natural Science
基 金:国家重大基础性研究攀登计划B资助
摘 要:悬索桥架设过程中,当主塔、主缆的施工误差超过规定的限值时,需通过吊索长度的调整,以消除这些误差对加劲梁施工的影响,保证成桥后桥面线形符合设计要求.为此提出了一种实用的调整吊索长度的计算方法.该法中成桥状态结构的几何形状及内力通过分2个阶段用几何非线性有限元法模拟整个架设过程,迭代得到.During the construction of suspension bridges, it is required that the length of hangers be adjusted so as to eliminate the effects on the stiffening-girder erection caused by the construction errors of towers and main cables, and to guarantee the curve of stiffening-girder meets the design requirement for completed bridge, when these errors exceed the tolerances. Thus, a practical approach of adjusting the length of hangers is proposed. In it, the geometry and internal force for completed bridge is obtained with an iterative procedure in which the whole erection process is divided into two stages and modeled by the geometric nonlinear finite element method. The implementation example shows that this approach is more precise.
分 类 号:U448.252[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117