检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹华先
机构地区:[1]广东省基础工程公司
出 处:《建筑技术》1999年第3期186-188,共3页Architecture Technology
摘 要:在广州、深圳和湛江地区三个采用柴油锤施打预制桩的工程中,出现了异常情况后,针对各工程不同地质条件(如石灰岩地质、不稳定地质、易隆起地质等),采取针对性措施,满足了承载力要求。The diesel pile hammer precast pile driving method has been adopted in t3 foundation works in the regions of Guangzhou,Shenzhen and Zhanjiang.However,there are special engineering geological conditions occured in their construction site.According to the various special engineering geological conditions (such as limestone geology,unstable geology and easily swelled geology),there are the respective proper measures to duly treat them;and eventually,every one's bearing capacity has been well fulfilled.
分 类 号:TU753.3[建筑科学—建筑技术科学] TU473.13
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90