检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:许铁军[1] 黄生洪[2] 宋云涛[1] 谢韩[1] 张平[1] 高大明[1]
机构地区:[1]中国科学院等离子体物理研究所,合肥230031 [2]中国科学技术大学,合肥230026
出 处:《核聚变与等离子体物理》2010年第3期245-249,共5页Nuclear Fusion and Plasma Physics
摘 要:对由埋管引起的面对等离子体第一壁热沉冷却结构冷却效果的下降进行了实验测量与数值模拟。在相同加热源条件下,比较了热沉内光孔、埋管打压胀管及高温真空埋管钎焊三种工艺实验件的换热效率,并与数值模拟的结果进行比较,确定了合理的计算模型和参数。对高场测的热沉原型件,比较了埋管打压胀管和高温真空钎焊连接换热效率,为EAST热沉冷却结构优化提供了依据。Cooling effect decline of the plasma facing components(PFCs) due to tube in heat-sink was studied experimentally and numerically.In the same heated wall condition,a heat exchange performance comparison is made among the processing technology of no tube in heat-sink,using high pressure to ensure residual stress between cooper tube and heat-sink,and high temperature vacuum welding.Numerical simulation was carried out,and a reasonable calculation models and parameters were determined.A heat-sink prototype heat exchange performance comparison is made between the processing technology of using high pressure and high temperature vacuum welding,to provide the basis for EAST PFCs cooling structure optimization.
关 键 词:EAST装置 面对等离子体部件 热沉 热交换 焊接
分 类 号:TL334[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249