沿空掘巷合理煤柱尺寸的数值模拟研究  被引量:4

Numerical Simulation Research on Rational Coal Pillar Size of Driving Roadway Along Goaf

在线阅读下载全文

作  者:程详[1] 

机构地区:[1]安徽理工大学能源与安全学院,安徽淮南232001

出  处:《煤炭技术》2010年第10期83-85,共3页Coal Technology

基  金:安徽省优秀青年科技基金(08040106831);高校省级自然科学研究项目(KJ2008A125);国家自然科学基金项目(50804003);教育部新世纪优秀人才项目(NCET-08-0819)

摘  要:以张北煤矿6煤为工程背景,采用理论计算,得出沿空掘巷合理煤柱宽度,并运用FLAC2D数值模拟软件对沿空掘巷不同煤柱宽度条件下,巷道两帮应力及巷道顶板位移和帮部位移的变化规律进行分析研究,得出适应工程实际的参考煤柱宽度。Take No.6 coal seam of Zhangbei Coal Mine as the engineering background,the theoretical calculations are adopted to obtaine a reasonable coal pillar width in driving roadway along gob,and numerical simulation software FLAC2D is used to analyse variation of the stress of the roadway between two groups and displacement of the roof and roadway's sides under the conditions of different widths of coal pillar on the driving roadway along goaf.The actual reference of coal pillar width is obtained for the project of driving roadway along gob.

关 键 词:煤柱宽度 数值模拟 沿空掘巷 

分 类 号:TD823[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象