检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华能海门电厂,广东汕头515100
出 处:《热力发电》2010年第9期74-77,共4页Thermal Power Generation
摘 要:介绍了华能海门电厂1000MW机组海水脱硫装置控制系统的总线设计方案,并针对使用Profibus和FF总线在安装、调试期间出现的问题提出解决方案。对1号、2号机组污染物排放验收检测结果表明,1号、2号锅炉平均脱硫效率分别为93%、94%,大气污染物排放浓度均符合GB13223—2003《火电厂大气污染物排放标准》的第3时段限值要求,大气污染物排放总量均低于粤环函〔2005〕1347号文件核定的排放总量控制指标。The designed bus scheme of the control system for desulphurization facility using seawater in Huaneng Haimen Power Plant has been presented,and directing against technical problems appeared during installation and debugging period of applying profibus and FF bus,the solving scheme being put forward.The monitoring result for acceptance of pollutant emission for units no.1 and no.2 shows that the average desulphurization efficiency of boiler no.1 and boiler no.2 is 93% and 94% respectively,the atmospheric pollutant emission concentration all conform to requirements of the limited value in third time-stage specified in the standard of GB13223-2003 《Atmospheric pollutant emission standard for thermal power plants》,the total amount of atmospheric pollutants is less than the control indices of total emission amount approved in document of Yuehuanhan (2005) NO.1347.
关 键 词:1000MW机组 烟气 海水脱硫 混合型现场总线 Pruofibus FF 污染物排放
分 类 号:TK323[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145