检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大庆油田钻探工程公司钻井二公司
出 处:《石油机械》2010年第9期49-51,88,共3页China Petroleum Machinery
基 金:大庆油田钻探工程公司科研项目"钻杆套管两用动力钳的研制"(ZPZJ09-02)
摘 要:为了提高原钻杆动力钳的使用效率,在其上增加套管钳功能,实现一钳两用的目的,研制了钻杆套管两用动力钳。该动力钳是在原钻杆动力钳的基础上增加套管动力钳功能。设计了上、下钳间隙调节气缸,使其性能参数能满足钻井及下套管施工需求。在两用动力钳上安装的扭矩控制记录仪,可测量、显示、记录和控制钻杆上扣时扭矩,以保证钻杆、套管上扣时的最佳拧接扭矩。在大庆油田的推广应用中,该动力钳均收到较好的应用效果。由于受结构尺寸的限制,该两用动力钳不适用于大于φ203.2mm的套管。To improve the service efficiency of the original drill pipe power tongs and achieve the dual purposes of the tongs,the dual power tongs for both the drill pipe and casing was developed. The tongs are based on the original drill pipe power tongs with the addition of the function of casing power tongs. The clearance between the upper and lower tongs and the regulation cylinder were designed to make their performance parameter satisfy the operating requirement of drilling and running casing. The torque control recorder was installed on the tongs to measure,display,record and control the torque when the drill pipe screws on and to ensure the optimal screwing torque when the casing screws on. The spread and application in Daqing Oilfield have achieved desirable effects. Due to the constraint of structural dimensions,the tongs are not suitable for the casing with a diameter larger than 203.2 mm.
分 类 号:TE935.03[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.94