检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,武汉430072
出 处:《中国农村水利水电》2010年第9期128-130,133,共4页China Rural Water and Hydropower
摘 要:针对深溪沟水电站泥沙淤积问题进行了相应的物理模型试验研究。在验证厂前导沙坎拦沙效果的基础上,分别研究了在电站正常运行结合泄洪冲沙以及关闭电站敞泄拉沙2种枢纽调度方式下的库区泥沙淤积物的冲刷效果。试验结果表明:关闭电站敞泄拉沙时库区泥沙淤积物被大量冲刷,河床高程明显降低,尤以来流量6 290 m3/s和3 300m3/s 2个级别的冲刷效果最好。The sediment accumulation of the Shenxigou Hydropower Station is studied and relevant physical modeling experiments are carried out.Based on the validation of the detention effect on sediment of the sand-guide sill before the power station,this paper is an attempt to study the scouring effect on sediment situation of the reservoir with two scheduling modes: sand sluicing with normal operation of the power station,and sand sluicing with closure of the power station.The experimental results show that on the latter scheduling mode,more sediments are scoured,especially with discharge scales Q=6 290 m3/s and Q=3 300 m3/s and the elevation of the river bed becomes noticeably lower.
分 类 号:TV149.2[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145