检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广西电网公司电力科学研究院,广西南宁530023 [2]南方电网技术研究中心,广东广州510623
出 处:《广西电力》2010年第4期1-4,共4页Guangxi Electric Power
摘 要:对500 kV岩平线加装高抗后出现的非全相运行时的工频谐振过电压问题进行了仿真和分析,认为造成岩平线出现过电压的原因主要是高抗补偿度较高、线路未换位造成三相参数不平衡以及高抗中性点电抗取值不合适。提出了解决岩平线过电压问题的技术措施。岩平线按照提出的技术措施进行了改造,改造后的试验结果表明提出的技术措施是有效的。The power frequency resonance overvohage problem of 500 kV Yan-ping transmission line under non-full phase operation after installation of high voltage shunt reactor is analyzed. Reasons of the overvoltage problem are found which are higher compensation degree of high voltage shunt reactor, untransposition of the transmission line and improper neutral reactor value of high voltage shunt reactor. Technical measures that the transmission line is transposed and the neutral reactor value is rechosen are proposed. Yan-ping trasnmission line is modified based on the proposed measures, and test results after the accomplishment of the modification project show that the proposed technology measure is effective.
分 类 号:TM866[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28