小孤山水电站方案布置及设计特点  被引量:1

Arrangement of Xiaogushan Hydropower Station and its design character

在线阅读下载全文

作  者:杨捷[1] 

机构地区:[1]甘肃省水利水电勘测设计研究院,兰州730000

出  处:《中国水利》2010年第18期58-60,54,共4页China Water Resources

摘  要:黑河小孤山水电站是甘肃省内陆河长引水隧洞径流式水电站的典型代表性工程。首部枢纽河床覆盖层深厚,并遭遇承载力极低的粉质黏土层等多种结构复杂的地层;厂房受区域性活动断层影响,采用地下厂房方案,是甘肃省已建工程中第一座完全地下式厂房。着重介绍小孤山水电站开发方案总体布置及枢纽、引水系统和地下厂房的设计特点,为其他类似工程的设计提供帮助和借鉴。Xiaogushan Hydropower Station in Heihe River is a typical long diversion tunnel hydropower station in Guansu Province. The first hub is covered by a thick layer of river bed, and encountered a complex silty clay layer with low capacity. Impacted by the regional chasm, the factory building is made underground, which is the first in Gansu Province. It introduces the arrangement and hubs, as well as the character of diversion system and underground factory building of Xiaogushan Hydropower Station, to provide a guide for the other similar projects.

关 键 词:方案布置 复杂基础 地下式厂房 隧洞薄衬砌 高压固结灌浆 

分 类 号:TV72[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象