宁夏“九五”与“十五”前兆观测系统整合  

The Integration of Precursor Observation System of "The Ninth Five-Year Plan" and "The Tenth Five-Year Plan" in NingXia

在线阅读下载全文

作  者:马文娟[1,2] 许文俊[1] 常明[1] 李芳芳[1] 梅浩[1] 赵刚[3] 张锦玲[1] 

机构地区:[1]宁夏回族自治区地震局,银川750001 [2]同济大学软件学院,上海200092 [3]中国地震局地壳应力研究所,北京100085

出  处:《华南地震》2010年第3期69-74,共6页South China Journal of Seismology

基  金:2007年公益性行业专项(H200708045)资助

摘  要:对宁夏地震局"九五"前兆仪器进行网络化改造,在确保"九五"观测系统正常的前提下,根据"九五"前兆台站的具体类型,提出"九五"前兆台站(仪器)与"十五"前兆台网的整合方案,完成宁夏地震局"九五"与"十五"前兆观测系统的并轨,以发挥前兆台网的整体优势。This article focuses on rebuilding the network of precursor equipment in "the ninth five-year plan" in Ningxia Earthquake Administration. Under ensuring that the system running well, and then according to the type of the stations, the paper proposes an scheme of integrating the network in "the ninth five-year plan" and in "the tenth five-year plan" and complete the scheme. All these work aim to take advantages of the integration.

关 键 词:前兆台网 “九五”仪器 “十五”系统 

分 类 号:P315.7[天文地球—地震学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象