检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]同济大学土木工程防灾国家重点实验室,上海200092
出 处:《石家庄铁道大学学报(自然科学版)》2010年第2期74-80,共7页Journal of Shijiazhuang Tiedao University(Natural Science Edition)
基 金:国家自然科学基金(90815007)
摘 要:目前国内所采用的缆索限位装置一般是作为构造措施,没有经过计算和设计,在地震作用下限位装置很难起到真正的防落梁效果。通过非线性时程方法对缆索限位装置进行了参数研究分析了不同周期比、限位装置刚度与缆索的松弛量对两联连续梁桥响应的影响,结果表明,连续梁桥采用缆索限位装置模式能有效的减小连续梁与过渡墩的相对位移反应。Domestic cable restrainer prevention system without design is usually adopted as construction measures, which can' t ascertain the effect of unseating prevention system. Cable restrainer prevention system for the continuous girder bridges is compared by nonlinear time-history method. Different period ratio, restrainer stiffness and relaxation of two continuous-beam bridge are considered for the modes of unseating prevention system. The results shows that continuous beam bridge with cable restrainers model can effectively reduce relative displacement between girder and pier for the continuous bridges .
分 类 号:U448[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4