岸边集装箱装卸桥前伸臂双拉杆拉点的优化设计  

Optimal Design about the Tension Point of Double Tension Bar of Front Arm on Shore Container Crane

在线阅读下载全文

作  者:郭燕[1] 张晓川[1] 郭建生[1] 

机构地区:[1]武汉交通科技大学

出  处:《港口装卸》1999年第2期3-5,共3页Port Operation

摘  要:在岸边集装箱装卸桥上,采用双拉杆支撑的前伸臂是一种超静定结构。对于这种超静定结构,通过合理地选择双拉杆拉点的位置,可以使得前伸臂上由拉点所分隔的各段中的最大应力值相接近,这样,前伸臂上的各段就能充分发挥其自身的作用。由此所获得的各段截面尺寸也应该是较为合理的。基于这一指导思想,本文提出了以追求前伸臂上各段中的最大应力值尽可能相接近为目标的优化设计方法。On the container crane,the boom supported by double tension bars is a redundance structure.Choosing reasonablely the locations of the tension points,for the boom,the max stress values in the boom′s several parts which are separated by the tension points can be equal approximalely.So,each several parts of the boom could be made the best use of and the several cross sections of the boom should be reasonable.Based on above view,this paper introduces a optimum design method.The target of the method enables the max stress values in the several parts of the boom to be equal as possible as it can.

关 键 词:前伸臂 拉点 优化设计 集装箱船 装卸桥 

分 类 号:U664.43[交通运输工程—船舶及航道工程] U653.928[交通运输工程—船舶与海洋工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象