Opportunistic Preventive Maintenance Optimization for Multi-Unit Series Systems with Combing Multi-Preventive Maintenance Techniques  被引量:7

Opportunistic Preventive Maintenance Optimization for Multi-Unit Series Systems with Combing Multi-Preventive Maintenance Techniques

在线阅读下载全文

作  者:周晓军 陆志强 奚立峰 李杰 

机构地区:[1]Department of Industrial Engineering, Shanghai Jiaotong University [2]University of Cincinnati

出  处:《Journal of Shanghai Jiaotong university(Science)》2010年第5期513-518,共6页上海交通大学学报(英文版)

基  金:the National Natural Science Foundation of China (Nos. 50905115 and 70771065);the National High Technology Research and Development Program (863) of China (Nos. 2009AA043403,2009AA043000 and 2008042801);the Shanghai Natural Science Foundation (No. 09ZR1414400)

摘  要:This paper proposes a dynamic opportunistic preventive maintenance (PM) optimization policy for multi-unit series systems by integrating multi PM techniques. Two PM techniques, periodic PM and sequential PM, are considered. Whenever one of the units reaches its reliability threshold, a PM action has to be performed on that unit. At that time the whole system has to be stopped and PM opportunities arise for the other unitsof the system. An optimal PM practice is determined by maximizing the short-term cumulative opportunistic maintenance (OM) cost savings for the whole system. Numerical examples are given to show how this approach works. Finally, a comparison between the proposed PM policy and the other policies is given.This paper proposes a dynamic opportunistic preventive maintenance (PM) optimization policy for multi-unit series systems by integrating multi PM techniques. Two PM techniques, periodic PM and sequential PM, are considered. Whenever one of the units reaches its reliability threshold, a PM action has to be performed on that unit. At that time the whole system has to be stopped and PM opportunities arise for the other units of the system. An optimal PM practice is determined by maximizing the short-term cumulative opportunistic maintenance (OM) cost savings for the whole system. Numerical examples axe given to show how this approach works. Finally, a comparison between the proposed PM policy and the other policies is given.

关 键 词:preventive maintenance PERIODIC SEQUENTIAL opportunistic maintenance dynamic optimization 

分 类 号:TB114[理学—概率论与数理统计]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象