基于S型ProA生长曲线的产品开发过程时间估算  

Time estimation method for product developmen process based on S-shaped growth curve of ProA

在线阅读下载全文

作  者:舒湘沅[1,2] 秦现生[2] 曹宜英[2] 

机构地区:[1]西北工业大学管理学院,陕西西安710072 [2]西北工业大学机电学院,陕西西安710072

出  处:《计算机集成制造系统》2010年第9期1875-1880,共6页Computer Integrated Manufacturing Systems

基  金:国家自然科学基金资助项目(70472066;70771091);国防科技工业技术基础研究资助项目(Z142008A001);西北工业大学人文社科与管理振兴基金资助项目(RW201002)~~

摘  要:为提高开发过程ProA时间估算的精度和动态性,引入当量的概念,研究了ProA入出项当量及其属性,提出了ProA生长曲线的概念,剖析了原子ProA的生长曲线以及生长曲线的合成关系,由此构建了开发过程的时间估算方法及估算模型,并通过应用分析验证了该方法和模型的可行性。To raise precision and dynamics of Activity and its Process(ProA)time estimation in product development process,the concept of equivalent was firstly introduced,and equivalent attributes of ProA input and output item were studied. Furthermore,the concept of growth curve was proposed. Growth curve of atomic ProA and synthetic relationship of growth curves were also discussed in detail. Then,time estimation method and estimation model of product development were established. Finally,the feasibility of the method and model was illustrated by application example.

关 键 词:产品开发 时间估算 当量 生长曲线 

分 类 号:TP15[自动化与计算机技术—控制理论与控制工程] F406[自动化与计算机技术—控制科学与工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象