Construction of 600 kt/a Coal-to-Methanol Project in a Final Sprint at Huating  

Construction of 600 kt/a Coal-to-Methanol Project in a Final Sprint at Huating

在线阅读下载全文

出  处:《China Petroleum Processing & Petrochemical Technology》2010年第3期65-65,共1页中国炼油与石油化工(英文版)

摘  要:The construction of the 600 kt/a coal-to-methanol unit in Huating,Gansu province,the investment in which totals 2.889 billion RMB,is in a final sprint stage.Currently a total of 2.5 billion RMB have been invested in the construction work with construction of the coal storage facilities,theThe construction of the 600 kt/a coal-to-methanol unit in Huating, Gansu province, the investment in which totals 2.889 billion RMB, is in a final sprint stage. Currently a total of 2.5 billion RMB have been invested in the construction work with construction of the coal storage facilities, the gas purification unit and civil engineering work for the coal slurrypreparation fully completed.

关 键 词:华亭煤 甲醇项目 后冲 气体净化装置 投资总额 甲醇装置 设施建设 甘肃省 

分 类 号:F426.72[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象