检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周进山
机构地区:[1]国电大渡河深溪沟水电有限公司,四川汉源625300
出 处:《人民长江》2010年第18期15-18,共4页Yangtze River
摘 要:大型水电建设工程投保工程一切险,是国际上通行的惯例和做法。但由于国内一些财产保险公司对水电工程建设管理业务不熟悉,而水电建设项目的业主也存在出险理赔管理工作滞后等问题,因而造成理赔谈判和履约困难。以深溪沟电站工程投保及理赔为例,分析了理赔服务质量和效率不高,以及被保险人自身管理上存在的问题,介绍了在赔付价格计算标准、工程出险赔付范围等方面的分歧及其协商处理办法,其理赔实例经验,可供投保工程险的项目业主理赔工作交流和参考。All risks insurance shall be arranged for a large - scale hydropower project according to international practices. However, some domestic property insurance companies are not familiar with the construction and management of hydropower projects and the employers are lagged in claims, so it is difficult to settle the claims and abide by the agreements. Taking the insurance and claims of Shenxigou Hydropower Project as an example, we analyze the service quality and efficiency of claims, as well as the management problems of insurants; introduce the bifurcations of compensation price calculation standard and compensation range and the corresponding countermeasures, which can provide references for the employers involved in engineering insurance.
关 键 词:工程一切险 理赔 重置价值 绝对免赔额 深溪沟电站
分 类 号:TV51[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.221