检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李万逵[1]
机构地区:[1]新疆水利水电勘测设计研究院,新疆乌鲁木齐830000
出 处:《水利与建筑工程学报》2010年第5期34-36,53,共4页Journal of Water Resources and Architectural Engineering
摘 要:河床深厚覆盖层的钻探工作始终是困扰阿尔塔什水利枢纽工程的主要问题之一,在其可行性研究阶段,根据已有地层的复杂特性,采用双管单动半合管、植物胶跟管钻进、及时调整护壁浆液的特性等方法,深厚覆盖层的钻探工作取得了长足的进展,使得问题得到较好地解决,本文对其进行了详细的分析和研究,供同行参考。The drilling for deep overburden layer of the riverbed is one of the major engineering questions in Aertashi Hydro Project.In the feasibility study stage,the drilling is made by using such methods as single acting and half enclosing with two tubes,drilling with vegetable gelatin following the tube,timely adjusting the slurry of the sidewall and so on based on the complexity of the strata,and the great progress has been achieved in the drilling for deep overburden layer,then,the engineering question in drilling has been better solved.The analysis and study about it are made here in detail,providing references for similar projects.
分 类 号:TV6[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143