机构地区:[1]中国水利水电第七工程局有限公司第五分局,四川彭山620860
出 处:《水利与建筑工程学报》2010年第5期90-93,共4页Journal of Water Resources and Architectural Engineering
摘 要:龙开口水电站筹建期砂石加工系统满足混凝土高峰期浇筑强度5.0×104m3/月所需成品骨料,系统主要采用了单条生产线的加工工艺。根据提高砂石系统生产保障率、系统平面布置更有利于毛料运输的原则对系统的加工工艺和平面布置进行了优化。经运行实践证明优化后的系统运行良好。In the preparation period of Longkaikou Hydropower Station,the aggregate processing system could meet the demand of concrete pouring strength 50 000 m^3 per month.The system,in the right beach in the upstream of the dam,mainly adopts a single line of processing.At the same time,its processing technology and general plan layout are optimized through improving the production qualification and improving the layout to be in favour of the rubble aggregate transportation.The practical operation proves that the optimized system works well.
分 类 号:TV42[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249