检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安建筑科技大学土木工程学院,西安710055 [2]北京首钢设计院,北京100043
出 处:《建筑技术开发》2010年第2期14-15,28,共3页Building Technology Development
基 金:陕西省自然科学基金项目(2007E202);西安建筑科技大学基础研究项目(JC0803)
摘 要:疏桩基础中桩的设置主要是为了减少和控制建筑物的沉降,并使建筑物基础满足整体承载力的要求。针对黄土地基存在湿陷性的特点,对黄土地基的湿陷性处理应充分考虑复合桩基设计的要求。研究了地基土刚度和桩基支承刚度的调整对基础不均匀沉降的影响,并对其进行了有限元分析。The pile establishment is mainly to reduce and control building's settlement in the sparse pile foundation, and makes the building foundation to satisfy the total bearing capacity requirement. According to the loess foundation has characteristic of collapsibility, the ground treatment for collapsible loess should wet to fully consider the compound pile foundation design's request. This article has studied the foundation soil rigidity and the pile foundation supporting rigidity adjustment to the foundation differential settlement influence, and has carried on the finite element analysis.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249