巴家嘴水库坝体变形裂缝问题分析  被引量:1

Analysis on Deformation Cracks of Dam Body in Bajiazui Reservoir

在线阅读下载全文

作  者:应敬浩[1] 张书光[1] 王登科[1] 

机构地区:[1]黄河勘测规划设计有限公司,河南郑州450003

出  处:《资源环境与工程》2010年第5期454-456,共3页Resources Environment & Engineering

摘  要:巴家嘴水库是一座集防洪、供水、灌溉及发电于一体的大(Ⅱ)型水利枢纽工程。大坝于1958年9月开工兴建,为黄土均质坝。由于多种原因,导致坝体建成近40年来持续不均匀沉陷变形,坝体裂缝几乎年年发生。由于工程质量问题,经评估鉴定,该工程为三类病险危坝,须进行扩容增泄、防渗灌浆等除险加固工作,以满足防洪保坝和供水的要求。Bajiaju reservoir is a large scale(Ⅱ) hydro-junction project with comprehensive functions of flood control,water supply,irrigation and power generation.The dam,which is a loess homogeneous dam,was started construction in September,1958.Because of various reasons,the dam body continued differential settlement in nearly four decades after completion and cracks of the dam occurs almost every year.As the project quality,the result of evaluation and identification showed that it belongs to a third kind of ill and risky dam.Strengthening and eliminating dangers,such as reservoir expansion and discharge increasing,impervious grouting must be carried out in order to satisfy the demand of the flood control and water supply.

关 键 词:大坝 变形 裂缝 

分 类 号:TV698.231[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象