检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李松[1] 温发明[2] 夏军武[2] 夏新强[2]
机构地区:[1]淮南煤电公司顾北煤矿,安徽淮南232151 [2]中国矿业大学建筑工程学院,江苏徐州221008
出 处:《徐州建筑职业技术学院学报》2010年第3期29-31,共3页Journal of XUZHOU Institute of Architectural Technology
摘 要:以某煤矿新建桥梁工程为例,经稳定性分析和沉降观测,在不满足承载力、沉降量要求的情况下,拟采用CFG桩或水泥土搅拌桩进行地基处理;通过理论计算对比分析,得知CFG桩明显优于水泥土搅拌桩,不仅承载力高,沉降量小,且能节约成本,起到保护环境的作用.Taking the case of the new-made bridge engineering is a coal mine,it was concluded based on the stability analysis and settlement observation to treat the foundation by CFG piles or cement-soil mixing piles under the conditions that the bearing and settlement requirements were not met.The theoretical calculation and comparative analysis resulted in that the CFG pile was obvioushy superior to the cement-soil mixing pile with high bearing capacity and low settlement as well as cost reduced and environment protected.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15