浅谈CAD、Word、excel联合应用于中部城市供水管道工程开挖量计算  被引量:1

Simple Discussion About Using CAD、WORD and EXCEL to Calculate Excavation Quantity of The Pipe Engineering For The Central City of Jilin Province Water Supply

在线阅读下载全文

作  者:宁鹏飞[1] 薛兴祖 

机构地区:[1]吉林省水利水电勘测设计研究院,吉林长春130021

出  处:《吉林水利》2010年第10期4-5,共2页Jilin Water Resources

摘  要:如何精确计算长距离不规则梯形开挖算量一直是工程设计人员所困扰的问题,普通的计算方法求工程量不仅耗费大量时间、人力、物力,而且工作效率低。文章采用cad、word、excel落节点与数学计算方法联合应用于计算吉林省中部城市供水工程梯形断面开挖算量,保证了计算精度,并有效地提高了工作效率。Engineers are beset by how to accurately calculate the long-distance irregular trapezoidal excavation quantity. Ordinary computational method not only cost much time, manpower, resources, but also inefficient. This paper applies CAD software, WORD software, EXCEL software, move down all nodes in CAD and the mathematical computation method to the trapezoidal engineering excavation quantity for the central city of JILIN Province Water Supply Project. The method ensure the accuracy and improve work efficiency.

关 键 词:CAD软件 WORD软件 EXCEL软件 节点 计算方法 工程开挖量 

分 类 号:TU991.33[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象