检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]安徽理工大学能源与安全学院,安徽淮南232001
出 处:《安徽理工大学学报(自然科学版)》2010年第3期23-28,共6页Journal of Anhui University of Science and Technology:Natural Science
摘 要:为了解决刘庄煤矿大断面煤巷复合破碎顶板稳定性难于控制,制约快速掘进,影响安全施工和巷道维护这一重大工程问题,运用FLAC3D数值模拟分析,对巷道断面和支护进行优化设计,提出人造拱形断面及滞后迎头一段距离的弱化支护技术,实现了最高月掘进1 510m的好成绩,为煤巷快速掘进顶板控制提供了保障。In order to solve the difficult engineering problems of compound broken roof control of roadway in coal seam with large cross-section,limiting fast excavation and safe construction and roadway maintenance,optimal design of roadway cross-section and its support was performed by using FLAC3D numerical simulation.Technology of man-made arch cross-section with delayed support at some distance from roadway heading face was proposed.With the technology a good effect of 1510 meters of excavation development in one month was achieved.The technology provides guarantee for roof control in fast excavation of roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.254.100