复杂条件煤巷掘进顶板控制数值模拟及应用  被引量:8

Numerical Simulation Research on Roof Control of Roadway in Excavation under Complex Conditions and Its Application

在线阅读下载全文

作  者:魏敬喜[1] 华心祝[1] 李迎富[1] 

机构地区:[1]安徽理工大学能源与安全学院,安徽淮南232001

出  处:《安徽理工大学学报(自然科学版)》2010年第3期23-28,共6页Journal of Anhui University of Science and Technology:Natural Science

摘  要:为了解决刘庄煤矿大断面煤巷复合破碎顶板稳定性难于控制,制约快速掘进,影响安全施工和巷道维护这一重大工程问题,运用FLAC3D数值模拟分析,对巷道断面和支护进行优化设计,提出人造拱形断面及滞后迎头一段距离的弱化支护技术,实现了最高月掘进1 510m的好成绩,为煤巷快速掘进顶板控制提供了保障。In order to solve the difficult engineering problems of compound broken roof control of roadway in coal seam with large cross-section,limiting fast excavation and safe construction and roadway maintenance,optimal design of roadway cross-section and its support was performed by using FLAC3D numerical simulation.Technology of man-made arch cross-section with delayed support at some distance from roadway heading face was proposed.With the technology a good effect of 1510 meters of excavation development in one month was achieved.The technology provides guarantee for roof control in fast excavation of roadway.

关 键 词:复合破碎顶板 大断面 人造拱形断面 滞后支护 顶板控制 

分 类 号:TD325.1[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象