三维可视化地下矿采掘进度计划编制及动态管理技术  被引量:2

Three-dimensional Visualized Underground Mining Schedule Plan Establishment and Dynamic Management Technique

在线阅读下载全文

作  者:曾庆田[1] 李德[1] 汪德文[1] 吴东旭[1] 严体[1] 赵艳伟[1] 

机构地区:[1]玉溪矿业有限公司,云南玉溪653100

出  处:《江西有色金属》2010年第3期88-91,共4页Jiangxi Nonferrous Metals

摘  要:通过直接导入三维精确采切设计及开拓设计成果,以生产者及其工效、矿山主要采掘工艺技术为约束,以线性规划为优化技术对矿山采掘计划进行编制,实现了计划编制的三维可视化及动态管理.文章从三维可视化地下矿采掘进度计划编制的基本原理、技术方法和实现手段,全面阐述了三维可视化地下矿采掘进度计划编制系统,并以实际工程应用情况说明了系统的可行性和科学性.Through introducing and developing three-dimensional exact mining and cutting design, with constraint of producers and their efficiency, mining techniques, and linear programming as optimal design to plan the mining, the three-dimensional visualization and dynamic management of the plan management is achieved. From the aspects of basic principles, techniques and actualizing method of the three-dimensional visualized underground mining plan establishment, this paper sets forth a comprehensive explanation of the plan management system of three-dimensional visualized underground mining, and of its feasibility and scientificity with practical examples in engineering.

关 键 词:三维 地下矿 采掘进度 计划编制 动态管理 

分 类 号:TP311.13[自动化与计算机技术—计算机软件与理论] TP391.41[自动化与计算机技术—计算机科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象