检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曾庆田[1] 李德[1] 汪德文[1] 吴东旭[1] 严体[1] 赵艳伟[1]
出 处:《江西有色金属》2010年第3期88-91,共4页Jiangxi Nonferrous Metals
摘 要:通过直接导入三维精确采切设计及开拓设计成果,以生产者及其工效、矿山主要采掘工艺技术为约束,以线性规划为优化技术对矿山采掘计划进行编制,实现了计划编制的三维可视化及动态管理.文章从三维可视化地下矿采掘进度计划编制的基本原理、技术方法和实现手段,全面阐述了三维可视化地下矿采掘进度计划编制系统,并以实际工程应用情况说明了系统的可行性和科学性.Through introducing and developing three-dimensional exact mining and cutting design, with constraint of producers and their efficiency, mining techniques, and linear programming as optimal design to plan the mining, the three-dimensional visualization and dynamic management of the plan management is achieved. From the aspects of basic principles, techniques and actualizing method of the three-dimensional visualized underground mining plan establishment, this paper sets forth a comprehensive explanation of the plan management system of three-dimensional visualized underground mining, and of its feasibility and scientificity with practical examples in engineering.
分 类 号:TP311.13[自动化与计算机技术—计算机软件与理论] TP391.41[自动化与计算机技术—计算机科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117