检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广西大学材料科学与工程学院,广西南宁530004 [2]广西南南铝业股份有限公司,广西南宁530031
出 处:《锻压技术》2010年第5期137-141,共5页Forging & Stamping Technology
基 金:广西自然科学基金项目(2010GXNSFA013020)
摘 要:针对铝型材分流组合模中分流桥的宽度对挤压成形的影响,采用Deform-3D有限元软件对15,20,25 mm这3种不同分流桥宽度下的3003铝合金圆管挤压过程进行数值模拟,得到了挤压力、应力等物理场量的变化规律。模拟结果表明,分流桥宽度为25 mm时,应力分布最均匀,流速均衡性最好;20 mm时,模具的应力集中分布区域最小。模拟结果为模具结构的合理设计提供理论指导。Aiming at the influence of shunting bridge width of aluminum porthole die to extrusion process,the extrusion process for three kinds of shunting bridge width(15,20,25mm)of 3003 aluminum alloy tubes were simulated by using Deform-3D software.The changes and distributions of the physical variables,such as extrusion load and stress were gained.Simulation results show that the stress distribution is evenest and the uniform flow velocity is best when the shunting bridge width is 25mm;when it is 20 mm,the regional distribution of mould's stress concentration is minimum.Simulation results provide a theoretical guidance for mould design.
分 类 号:TG375.41[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.251.83