紫坪铺水利枢纽工程关键技术问题与对策  

Key technological problems and countermeasures of Zipingpu water control project

在线阅读下载全文

作  者:杨志宏[1] 陈惠君[1] 

机构地区:[1]四川省水利水电勘测设计研究院,成都610072

出  处:《中国水利》2010年第20期59-64,共6页China Water Resources

摘  要:紫坪铺工程面板坝坝体变形和沉降控制与#1、#2泄洪洞高速水流控制设计是本工程突出的两个关键技术问题,面板堆石坝设计中成功采用表面振动器法测试最大干密度,以压实度确定坝料填筑标准的方法;#1、#2泄洪洞创新地采用了簸箕状挑坎和缓坡段环形掺气挑坎,成功解决了46m/s的超高水流速问题。Both dam body deformation and settlement control with design of high velocity flow control for #1 and #2 discharge tunnels are the two prominent technical issues for Zipingpu project.The surface-type vibrator method is used to measure maximum dry density and also the compaction degree is used to determine dam material filling standard in the design of concrete-faced rockfill dam.Dust-pan shaped bucket and annular bucket aerator at gentle-slope section are adopted for #1and #2 discharge tunnels as innovative approaches,which successfully solve 46m/s hyper velocity flow problem.

关 键 词:紫坪铺 坝体变形和沉降 压实度 簸箕状挑坎 环形掺气挑坎 

分 类 号:TV61[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象