作 者:张磊[1] 梅柏杉[1] 杨林涛[1] 王晗[1] 胡文齐[1]
机构地区:[1]上海电力学院电力与自动化工程学院,上海200090
出 处:《华东电力》2010年第9期1409-1412,共4页East China Electric Power
基 金:上海市教育委员会重点学科建设项目资助(J51301);上海市教委自然科学基金(07ZZ146)~~
摘 要:首先分析了最常见的永磁同步发电机组和双馈发电机组的数学模型,并构建了一个9MW的风电场接入配电网的仿真模型,在仿真模型上对输电网处和风电场出口处进行了三相短路故障的仿真,在两种短路情况下,对有、无风电场接入时的情况进行了对比分析。仿真结果表明,为确保系统的稳定运行,不能忽略风电场接入对系统产生的影响。Firstly,the mathematic models of the most common permanent magnet synchronous generator units and doubly fed generator units were analyzed,and the simulation model of a 9 MW wind farm connected distribution network was constructed,Based on the simulation model,the simulations of three-phase short circuit faults in the distribution network and at the outlet of wind farm were carried out.Under the two situations of short circuit,the situations with or without wind farm connection were compared and analyzed.The simulation results indicate that in order to ensure the stable operation of the system,the generated influence of wind farm connection on the system could not be neglected.
分 类 号:TM77[电气工程—电力系统及自动化] TM614
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229