检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁月明
机构地区:[1]朝阳新华钼矿,辽宁朝阳122304
出 处:《中国钼业》2010年第5期13-18,共6页China Molybdenum Industry
摘 要:新华钼矿生产竖井需要延深,上部还要正常生产,原竖井下掘到目前位置又没有给以后的延深留有足够的条件,给下一步延深留下了很大不便因素,本文重点分析论述竖井延深方案的选择和上下部分连接后安全防护的设计及相关的计算。因为在方案选择上处理得当将最小限度的影响生产,使得上部生产和下部井建获得最大效益,更重要的是使竖井下掘时避免重大安全事故的发生。Xinhua molybdenum shafts need to extend deep,but also keep the upper part functioning normally.The original shaft dug into the current location leaves no sufficient space for the next phase of extension,which is a great inconvenient factor.This article mainly analyzed and discussed the deep shaft extension options and the upper and lower parts of the program connected to security design and related calculations.Because the choice of handling it appropriately in the program will be minimal impact of production,enabling the upper and lower production wells built for maximum efficiency,more importantly,is to dig under the shaft to avoid major security incidents from occurring.
分 类 号:TD864[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.203.21