抢修抢建技术中软土地基有效桩长的确定方法研究  被引量:2

On Effective Pile Length Calculation Method of Soft Ground in Rush to Repair and Construction

在线阅读下载全文

作  者:杨晓蓉[1] 张跃[1] 王艳红[1] 王静[1] 

机构地区:[1]军事交通学院基础部,天津300161

出  处:《军事交通学院学报》2010年第6期77-80,共4页Journal of Military Transportation University

摘  要:地基是各种交通设施的关键部位,是抢修抢建的主要内容。软土地基地质条件差,修建桥梁及涵洞时遇到软土地基多采用水泥搅拌桩进行处理,会存在有效桩长的问题。根据刚性基础下桩土顶面的位移协调条件,从沉降的角度出发,得到了柔性桩复合地基有效桩长的计算方法。The ground is the key to various transport facilities,it becomes the main element to the rush to repair and construction.When the bridges and culverts construct on soft ground,concrete mixing piles are usually used because soft ground has poor geological conditions,the issue of effective pile length will exist at this time.In this paper,the effective pile length of soft composite pile is calculated from the point of the settlement which is based on the displacement harmony condition of the rigid ground.

关 键 词:抢修抢建 软土地基 有效桩长 摩擦桩 位移协调条件 

分 类 号:TU473.11[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象