检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海市电力公司,上海200122
出 处:《供用电》2010年第5期35-38,共4页Distribution & Utilization
摘 要:对工程项目进行后评价有利于提高投资决策及投资管理的水平。以上海某新建35 kV输变电工程项目为例,按照项目后评价有关要求,重点从技术水平评价、项目运营情况评价、项目经济效益评价三个方面,运用统计预测法、有无对比法、层次分析法和多种综合评价法等方法,对该工程项目进行后评价,较客观地评价了工程项目的成功与不足。The post-evaluation on the project is helpful to improve the investment decision-making and management level. Taking a 35kV newly built power transmission and distribution project in Shanghai as example, post-evaluation is conducted according to relevant requirements of the post-evaluation, focusing on the evaluation in the respects of technology, operation and economic performance in the methods of statistics forecast, with and without antitheses, level analysis and comprehensive evaluation etc, to list out the advantages and disadvantages of this project objectively.
分 类 号:TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145