广州地铁四号线车黄区间盾构施工参数优化与地表沉降控制  被引量:2

The Shield Tunneling Parameter Optimization and Surface Subsidence Control in Che-Huang Tunnel Station Sector of Guangzhou Subway Line 4

在线阅读下载全文

作  者:林辉[1] 吴文彪[1] 

机构地区:[1]广东水电二局股份有限公司,广州510663

出  处:《广东土木与建筑》2010年第8期48-50,共3页Guangdong Architecture Civil Engineering

摘  要:为提高盾构隧道施工技术水平,控制地表沉降,本文以广州地铁四号线北延段车陂至南村站区间盾构隧道工程为背景,分析了盾构隧道引起地表沉降的主要施工参数并进行了相关的优化,通过分析地表沉降的时间规律,研究提出了控制盾构掌子面、盾体通过和盾尾脱出时三个阶段地表沉降的可行技术工艺。In order to raise the shield tunnel construction technique level,control the ground surface settlement,this article uses the Guangzhou subway 4 line north extends section Che-Huang station sector as engineering background,analyzes the shield tunnel main construction parameter cause the surface subsidence, summers and optimized the construction parameter. Through analyzes the time rule of surface subsidence,this article proposes the feasible technical craft to control surface subsidence including the shield face,the shield body through and the shield tail leaves.

关 键 词:盾构施工 地表沉降 参数优化 沉降规律 

分 类 号:U231.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象