检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩星俊[1] 方俊波[2] 卢智强[3] 李集光[3]
机构地区:[1]昆明铁路局,昆明650011 [2]中铁隧道集团有限公司,河南洛阳471009 [3]中铁隧道集团一处有限公司,重庆401121
出 处:《隧道建设》2010年第5期549-553,共5页Tunnel Construction
摘 要:为解决仰拱施工对洞内运输线的施工干扰问题,以不同的洞内运输方式为对象,论述了多跨支墩轨道式仰拱栈桥设计及仰拱施工、单跨钢便梁式仰拱栈桥施工技术,并提出了仰拱施工注意事项,确保了洞内运输线的通畅及施工的正常进行。Several transportation modes in tunnels are studied in order to eliminate the influence of the invert construction on the transportation lines in tunnels.The design of multi-span buttress rail-bound invert trestle and the corresponding invert construction technology and the design of single-span steel beam invert trestle and the corresponding invert construction technology are presented.In addition,key points of invert construction are proposed.The technologies presented in this paper ensure the smooth transportation and construction in tunnels.
关 键 词:仰拱全幅施工 多跨支墩式 单跨钢便梁 全液压轨行式
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117