线形输水工程施工测量控制系统的建立  被引量:4

Establishment of construction survey control system for linear water transfer project

在线阅读下载全文

作  者:李军安[1] 严亚敏[1] 

机构地区:[1]陕西省水利电力勘测设计研究院测绘分院,西安710002

出  处:《西北水电》2010年第5期11-13,20,共4页Northwest Hydropower

摘  要:文章详细介绍建立李家河水库输水工程施工测量控制网的设计技术思路和控制网布设。针对线形输水工程不同部位施工放样精度要求,建立整体统一、局部相对独立的施工平面控制网方案;采用高精度地面观测边长与GPS观测数据混合网平差方法,通过测量成果分析验证其可靠性和精度;对网状施工高程控制网的外业联测已知点的必要性进行实例介绍。The paper presents in detail the design concept and arrangement of construction survey control network for the Lijiahe reservoir water transfer project.For the accuracy requirements of construction set-out at different locations of the linear water transfer project,an option of construction plane control network,integrated as a whole and independent locally,is set up.By use of the high-precision ground-based observation side length and the mixed network adjustment method of GPS observation data,the survey results are analyzed to justify the reliability and accuracy of the network.Besides,the paper describes the necessity of external joint survey points for the mesh construction elevation control network.

关 键 词:线形输水工程 施工测量 控制网布设 李家河水库 

分 类 号:TV221.1[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象