检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姚银佩[1] 李夕兵[1] 赵国彦[1] 赵晓昕[1] 彭康[1]
机构地区:[1]中南大学资源与安全工程学院,湖南长沙410083
出 处:《矿业研究与开发》2010年第5期6-8,43,共4页Mining Research and Development
摘 要:山东新城金矿V#矿体二步矿房开采出现严重的安全问题,原有机械化水平分层充填法已不能满足生产需要。通过对开采技术条件的分析,提出了4种较为适合的采矿方案,为了能够尽可能的消除经验因素的影响,采用模糊数学的方法将各方案评价指标进行量化分析,对新城金矿二步矿房采矿方法进行了优化选择,从中选出预控顶上向凿岩分段充填采矿法。研究表明,此方案具有较好的实际适用性,是一种比较安全、高效、经济的采矿方法,能够满足矿山安全开采的要求。In Xincheng gold mine,Shandong province,there is serious security problem in mining the second-step chambers of Ⅴ# ore-body,the mechanized horizontal cut and fill stoping hasn't met the needs of mine production.Based on analysis of the mining conditions,four suitable mining schemes were put forward.The quantitative analysis on the evaluation indexes of the different mining methods was carried out by fuzzy mathematics method in order to eliminate the effect of personal experience as possible,and then the optimal selection of mining method for the second-step chambers in the Ⅴ# ore-body was made.The optimal one is upward sublevel drill and fill stoping with roof pre supporting,which is a safe,efficient and economic mining method,is of better applicability,can meet the needs of safe mining in the mine.
分 类 号:TD863[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229