检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王敦球[1] 赵成根[1] 孙晓杰[1] 张溪[1] 林华[1]
机构地区:[1]桂林理工大学环境科学与工程学院,广西桂林541004
出 处:《中国给水排水》2010年第22期69-71,74,共4页China Water & Wastewater
基 金:国家水体污染控制与治理科技重大专项(2008ZX07317-02);教育部新世纪优秀人才支持计划(NCET-08-0649)
摘 要:针对桂林市七里店污水净化厂进水有机物浓度偏高、TP去除效果不稳定、能耗较高的现状,将普通Carrousel氧化沟工艺改进为Carrousel 2000系统、立式表面曝气系统改进为深水微孔曝气和水下推流相结合的曝气系统。实施改造后,污水处理厂出水水质稳定,节电约600~1000kW·h/(10^4m^3·d^-1)。Aimed at the high organic concentration, instable removal effect of TP and high energy consumption in Qilidian WWTP in Gulin City, the conventional Carrousel oxidation ditch process was reconstructed into Carrousel 2000 system, and the vertical surface aeration system was reconstructed into a combined aeration system of deep microporous aeration and underwater plug flow. After the reconstruction, the effluent quality of WWTP is stable, and the electric energy of 600 to 1 000 kW · h/(10^4m^3·d^-1)is saved.
分 类 号:X703.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49