检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]福建省教育部共建海洋环境科学联合重点实验室/厦门大学环境科学研究中心,厦门361005 [2]福建省环境监测中心站,福州350003
出 处:《生态学报》2010年第21期5914-5924,共11页Acta Ecologica Sinica
基 金:国家自然科学基金资助项目(70771098)
摘 要:基于围(填)海负面生态影响的分析,针对海岸带生态系统各类服务自身的特点,运用直接市场法、替代市场法、调查评价法和成果参照法,构建了围(填)海造成的海岸带生态系统服务损害的货币化评估模型,并应用于厦门同安湾的案例研究。尝试对同安湾4个围(填)海规划方案可能造成的海岸带生态系统服务损害进行货币化评估。结果显示,从方案一至方案四,随着围(填)海面积的增大,其导致的生态系统服务损失依次为13593万元/a、54392万元/a、67937万元/a和147848万元/a,单位面积损失依次为68.65元/(m·2a)、70.36元/(m·2a)、72.43元/(m·2a)和76.84元/(m·2a)。基于评估结果,针对厦门围(填)海的现状提出了相关的政策建议。Coastal zones cover only 10% of the earth's surface but are inhabited by over 50% of the world's population and become regions with diverse,essential,and extensive economic activities. In China,to resolve the conflict between economic development and land shortage,reclaiming land from sea has become increasingly intense in many coastal cities from the 1980s. While expanding land areas for economic production of various types,construction of factories and dwellings,and increasing economic benefits,sea reclamation activities have nevertheless caused a series of negative effects on coastal ecosystems by either displacing or destroying them. Unfortunately,some decision-makers and others,such as developers,often pay more attention to short-term direct economic benefits while ignoring ecological damages and environmental degradation from sea reclamation projects. To account for those damages,therefore,it is necessary to monetarily evaluate the losses of coastal ecosystem services induced by sea reclamation activities and to integrate that information into the planning,exploitation and management decisions affecting coastal zones. Tong'an Bay,located to the north of Xiamen Island,has a sea area of 89. 9 km2,featuring a half-closed sea bay with a narrow entrance exemplifies the assessment of those damages. Since 1950,the reclamation projects in Tong'an Bay have added 33. 65 km2 of land. As a result of the urbanization of Tong'an district and the development of the West Side Economic Zone of the Taiwan Strait,the sea reclamation demand in Tong'an Bay continues to exist. This paper focuses on the four sea reclamation planning projects to be developed in Tong'an Bay,Xiamen. Based on the analysis of the adverse effects of sea reclamation projects on coastal ecosystems,and considering the characteristics of coastal ecosystem services,the paper establishes the monetary valuation models to estimate the losses of coastal ecosystem services associated with sea reclamation projects. The methods for building these mod
分 类 号:X820[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.20