检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王庆新[1,2,3] 吴建平 赵玉玺
机构地区:[1]水利部天津勘测设计研究院 [2]天津市环卫研究所水利部 [3]东北勘测设计研究院
出 处:《东北水利水电》1999年第5期12-14,共3页Water Resources & Hydropower of Northeast China
摘 要:某水利枢纽的溢流坝为曲线型重力坝,由两边各2孔(高挑坎)和中间4孔(低挑坎)组成。选取了两种不同粒径的散粒体模拟基岩研究下游消能,试验测了水舌入水形态和相关的一些水力学参数,试验结果表明,该工程坝的基础、右侧电厂和尾水渠导墙未受到冲刷破坏,溢流坝的泄流能力满足设计要求。The spillway dam of a project is a curved gravity dam. It consists of 2 discharge orifices with high flip bucket in the both sides and 4 orifices with low flip bucket in the middle part. The experiment of energy dissipation selects 2 non-coherent materials of different particle sizes to simulate the rock bed below dam. The pattern of the jets entering into water and the correlative hydraulic parameters are measured. The experimental result shows that the dam foundation, power station at right side and guide wall of tailrace is safe from scour. The discharge capacity of the spillway dam meets the designed demand.
分 类 号:TV653[水利工程—水利水电工程] TV652.11
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7