检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张东亮[1,2] 刘保县[1] 李荣鑫[1] 李旭[1]
机构地区:[1]西华大学建筑与土木工程学院,四川成都610039 [2]天津华北工程勘察设计有限公司,天津300170
出 处:《西华大学学报(自然科学版)》2010年第6期92-94,共3页Journal of Xihua University:Natural Science Edition
摘 要:因"5.12"汶川特大地震影响,某水泥库受到严重损坏。依据工程鉴定结果及该水泥库的破坏情况,加固方案中水泥库壁采用沿裂缝粘贴钢板的方式进行加固,环形梁采用梁下加腋的方式进行加固,局部混凝土结构裂缝采用封闭补强裂缝的方式进行加固。本文从技术可行性、施工周期、工程造价等方面综合考虑加固方案,并简要介绍加固的施工过程,也为以后类似工程提供了有价值的参考。A cement silo with tube structure was seriously damaged in "5.12" Wen chuan Earthquake.Based on the evaluation results and the actual condition of the cement silo,cylinder wall was strengthened by means of pasted steel plate along the crack while circular beam was strengthened by means of haunched beam.Partial concrete structure was strengthened by means of repairing crack.In consideration of technical feasibility,construction cycle and project construction cost,the construction procedure of strengthening was also introduced in this paper.It provides future similar projects with useful reference.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195