检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水利与建筑工程学报》2010年第6期67-68,138,共3页Journal of Water Resources and Architectural Engineering
基 金:黄河洪水管理亚行贷款项目(YH-SW-XH-02)
摘 要:2010-07-23~2010-07-24黄河中游支流洛河流域发生了一次较大的洪水过程,洛河中上游多站出现建站以来最大洪峰流量。受伊洛夹滩漫滩及橡胶坝影响,洪水在伊河龙门镇、洛河白马寺~黑石关河段出现了传播时间延长、削峰率大等异常现象。本文对该次洪水的组成、洪水特性及出现异常现象的原因进行了初步分析。On July 23 - 24, 2010, a larger flood occurred in Luohe River, a tributary in the middle course of Yellow River. The largest flood peak since the establishment of the station appears in the multi-hydrological stations in the upper and middle reaches of Luohe River. Under the influence of rubber dam and the beach area between Yihe River and Luohe River, some abnormal phenomena appear such as the reduction of peak rate and prolonging of propagated time in Longmenzhen station to Heishiguan station reach and Baimashi station to Heishiguan station reach. Here, the composing of the flood in July 2010, the analysis of its characteristics and the reasons of abnormal phenomena appeared are analyzed primarily.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15