检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西北农林科技大学水利与建筑工程学院,陕西杨凌712100
出 处:《水利与建筑工程学报》2010年第6期94-95,107,共3页Journal of Water Resources and Architectural Engineering
摘 要:长塘水电站大坝为碾压混凝土双曲拱坝,最大坝高88 m,采用3表孔+1中孔泄洪消能方式。本文介绍了泄洪消能布置方案的研究,泄水建筑物体型优化,以及3个溢流表孔采用锥形体鼻坎体型,解决长塘泄洪中出现的向心水流和消能防冲问题的研究成果。The dam of Changtang Hydropower Station, with the maximum height being 88 m, is a roller compacted concrete double-curvature arch dam, whose type for flood discharge and energy dissipation is three top holes plus one medium outlet. Here, its layout scheme for flood discharge and energy dissipation and the optimized layout of outlet structures are introduced in detail. The conical buckets are used in three overflow top holes in order to slove such the problems as the centripetal flow, energy dissipation and erosion control during flood discharge in Changtang Hydropower Station.
分 类 号:TV652.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145